Flexible task assignment and assembly scheduling for human-robot collaboration cell considering uncertainty
研究了多产品装配中多人多机器人协作环境下的任务分配与调度优化,用三角中智数表示不确定性,提出改进遗传算法最小化模糊周期时间,通过锂电池组装配案例验证了有效性。
To rationally allocate production resources and manage production processes while balancing efficiency and stability. This paper investigates the optimisation of task assignment and scheduling in a collaborative environment involving multiple humans and robots for multi-product assembly. Considering the preferences of both humans and robots, diverse tasks are assigned to different operation modes, including human-only, robot-only, and collaborative human-robot. In this study, single-valued triangular neutrosophic numbers (SVTN) are used to represent the uncertainty of the HRC task schedule. The goal is to minimise the fuzzy product cycle time, by fully utilising human and robot resources while maintaining allowable idle time. An improved genetic algorithm (IGA) is proposed to optimise the human-robot task assignment and assembly sequence. It includes human or robot selection, assembly sequence as chromosome coding, and active decoding under the constraints of different HRC types. The proposed model has been tested on a case study involving the assembly of lithium battery packs to demonstrate its feasibility in improving HRC assembly efficiency. Computational results show that the model can effectively reduce cycle time and control uncertainty variance in most scenarios, with IGA and SVTN outperforming other methods.