具有联合重构和多种不确定性的相互依赖水-电网络的多时间尺度风险规避恢复
Multi-timescale risk-averse restoration for interdependent water–power networks with joint reconfiguration and diverse uncertainties
Reliability Engineering and System Safety · 2025
被引 12
ABS 3
- Yesen Yang
- Zhengmao Li
- Edmond Y. M. Lo 通讯
电力系统水资源管理基础设施韧性优化与控制