现货收入、资本结构与权衡理论:分析合同可再生能源的投资风险

On spot revenues, capital structure and trade off theory: Analysing investment risk for contracted renewables

Energy Economics · 2025
被引 3
人大 A-ABS 3

中文导读

研究了澳大利亚电力市场中半商业性可再生能源项目的资本结构优化问题,发现部分现货收入暴露的项目能在不增加违约风险的情况下支持高债务水平。

Abstract

In decarbonising power systems, shifting dynamics require that investors lend careful consideration when structuring plant revenues – or risk violating the constraints of private capital markets. In Australia's National Electricity Market, new variable renewable energy (VRE) plant was traditionally ~100 % revenue contracted via power purchase agreement (PPA) to facilitate bankability and provide stable returns. However, sharply falling VRE costs have enabled the emergence of a new asset class, viz. VRE with ‘semi-merchant’ cashflows, comprising both PPA contracted and spot market (i.e. merchant) exposed revenue streams. This blended revenue mix, which has dominated new entry in Australia, raises questions vis-à-vis capital structure optimisation as both investors and financiers grapple with the re-introduction of spot revenue variability. In this paper, stochastic modelling techniques are applied to stress-test new entrant wind plant cashflows under a full spectrum of PPA cover levels and within capital market (i.e. project finance) constraints. Under ordinary market conditions, a run-of-plant PPA with at least ~50 % revenue cover is found sufficient to mitigate technical default risk and secure commercial debt levels. However, the relationship between PPA cover and default (i.e. distress cost) risk is also found to be decidedly non-linear, with some semi-merchant structures capable of supporting debt levels equivalent to 100 % PPA plant without introducing material default risk – an unexpected finding. Presented results identify the limits of a PPA to extract equity capital risk from a stand-alone VRE asset and, by implication, the limits of cost of capital optimisation in line with Modigliani and Miller's seminal writings on capital structure.

可再生能源资本结构项目融资收入风险