🌙

多集装箱码头合作下的泊位分配与岸桥联合调度

Integrated berth allocation and quay crane assignment under cooperation among multiple container terminals

Annals of Operations Research · 2025
被引 0
ABS 3

中文导读

研究了港口内多个集装箱码头合作时,如何联合优化泊位分配和岸桥调度,以最小化总运营成本(包括船舶延误、集装箱转运和岸桥成本),并设计了自适应大邻域搜索算法求解,实验表明合作能显著降低成本并提高服务水平。

Abstract

Abstract As international trade thrives, terminal operators attempt to increase productivity to satisfy the growing demand and offer better services for customers. Cooperation among multiple terminal operators in a port is an option to better utilise the existing resources and achieve a high level of service without additional capital investment. To achieve an effective and efficient operation under cooperation, this study investigates a joint problem of berth allocation and quay crane assignment considering coordinated operation among multiple terminals in a port. Mixed-integer linear programming model considering operational constraints is developed to minimise the total operation cost, including the delay cost of vessels, transshipment cost of export containers and crane assignment cost. An adaptive large neighbourhood search algorithm is proposed to solve the integer linear programming model and tested in a series of numerical experiments. Numerical results show that cooperation not only helps to reduce the total operation cost significantly but also increases the level of service by reducing the number of delayed vessels and their total delay time. Moreover, the proposed algorithm outperforms the commercial solver, Gurobi, with better convergence results and less computational time, which enables the proposed algorithm to be applied to large-scale real-world problems.

港口运营运筹优化集装箱码头合作调度