铁路机车调度问题的求解

SOLUTION OF A RAILROAD LOCOMOTIVE SCHEDULING PROBLEM

Journal of the Operational Research Society · 1980
被引 1
ABS 3

中文导读

提出一种基于线性规划模型的启发式方法,为给定列车集合的铁路机车找到最小成本的调度方案,支持列车发车时间固定或可变,能给出良好的整数解。

Abstract

A method is described for finding a minimum cost set of schedules for railway locomotives to work a given set of trains. The times at which the trains start may be fixed or variable. A heuristic method, based on a linear programming model, is described. This gives good integer solutions to the problem.

运筹学整数规划交通运输调度优化